|
|
Education
|
| Experience
iNet Administrator
University
of Missouri, Columbia
Geographic Resources Center
16 Stewart Hall
Columbia, MO 65211-6170
Dates Employed: 11/1999-Present
Grade Level: Specialist
Hours per Week: 40
Design
and maintain websites using advanced HTML, including forms to e-mail
and JavaScript form validation, JavaScript for mouseovers, dropdown menus
and other functionality. Extensive use of Adobe Photoshop to create
buttons and web compatible images. Good experience of Macromedia
Dreamweaver and Fireworks. Setting up and administration of Apache webserver
and SSL on win32 operating systems. Examples of my work as follows: ASPRS (American
Society for Photogrammetry and Remote Sensing), MSDIS (Missouri
Spatial Data Information Service), MSDIS-Mapper (Internet
Map Server utilizing ESRI's ArcIMS Software), GRC (Geographic
Resources Center), University of Missouri-Columbia Department
of Geography.
Engineering
Planner
Coordinator
AstraZeneca
Pharmaceuticals
Mereside Engineering Services
Alderley Park
Macclesfield, SK10-4TG
United Kingdom
Dates Employed: 07/1998-11/1998
Hours per Week: 37.5
Developed
planned maintenance procedures for critical items of engineering plant
including air handling systems, animal drinking water systems, laboratory
gas supply systems and portable electrical appliances. Liaised with departmental
and laboratory managers to schedule plant shutdowns for essential maintenance.
Responded to plant and equipment breakdowns and organized rapid repair
or replacement. Organized removal and disposal of redundant plant and
equipment with due respect to hazardous materials including radioactive
contaminants. Prioritized daily workload and managed overtime working
for team of twelve maintenance technicians. (Supervisor's Name: Mr N
Furmston. Phone: +1 44 1625 516095.)
Technical Clerk
AstraZeneca
Pharmaceuticals
Hurdsfield Industrial Estate
Macclesfield, SK10-2NA
United Kingdom
Dates Employed: 11/1997-07/1998
Hours per Week: 37.5
Developed
planned maintenance procedures for new tablet manufacturing facility. Identified
critical spares for new plant and created on-line spares catalog. Ordered
spares inventory. Developed procedures for calibration and performance
monitoring for critical instrumentation. Responded to plant breakdowns,
organized speedy repair operations with due respect to health, safety
and environment. (Supervisor's Name: Mr Clive Callister. Phone: +1 44
1625 513739.)
Amphibian Team
Leader
Hyder
Environmental
Howard Court
Manor Park
Runcorn, WA7-1SJ
United Kingdom
Dates Employed: 06/1997-11/1997
Hours per Week: 40
Lead
small field teams trapping and translocating protected amphibian species
as part of environmental impact mitigation prior to airport construction.
Created new habitat for translocated animals. Conducted macro invertebrate
sampling of ponds affected by construction project to check for protected
species. (Supervisor's Name: Ms Emma Steven. Phone: +1 44 1928 579955.)
Laboratory Technician
University
of Manchester Institute of Science and Technology
Dept. of Civil and Structural Engineering
Sackville St.
Manchester, M60-1QD
United Kingdom
Dates Employed: 02/1994-09/1994
Hours per Week: 37.5
Conducted
laboratory and on site testing of structural cast iron beams. Assembled,
commissioned and modified test laboratory and on site test rigs. Installed
all instrumentation for tests, recorded all test data using computerised
data acquisition equipment. Organized all equipment and transport for
site tests and completed tests on time and within budget. (Supervisor's
Name: Mr T. Swailes. Phone: +1 44 161 236 3311.)
Plant Engineer
GEC
Alstom Turbine Generators
Barton Aerodynamics Laboratory
Mercury Way
Manchester, M31-2LD
United Kingdom
Dates Employed: 01/1987-02/1994
Hours per Week: 37.5
Implemented
repairs and maintenance and modifications of plant, test rigs and buildings.
Produced specifications and budgets for projects. Supervised contractors
undertaking project work on site. Visited contractors to solve manufacturing
problems. Setup safety test procedures for portable electrical equipment
and residual current circuit breakers to comply with legislation. Reorganized
and operated site purchasing system, negotiated prices with suppliers.
(Supervisor's Name: Mr John Ringrose ret.)
Production Engineer
GEC
Alstom Turbine Generators
Trafford Park Works
Westinghouse Road
Manchester, M60-1AE
United Kingdom
Dates Employed: 11/1982-01/1987
Hours per Week: 39.5
Procured
materials for manufacture of large steam turbine components from internal
and external sources. Compiled and checked inspection records for finished
goods prior to shipment. Assisted in the introduction of a computerised
workshop scheduling system. (Supervisor's Name: Mr Andrew Towers.)
Job-related
skills & training
Building
a Distributed GIS Using ESRI's ArcIMS Software, Pre-conference Seminar,
San Diego, CA - June 2000
WWWPlannerTM. Planning
for website design. Memberware Technologies, Bethesda, Maryland; Dec
1999
Introductory training for volunteer water
quality monitors; 1999
Introduction to HTML & website design;
1999;
SAP R3; 1998
Microsoft Windows '95, NT4, Microsoft Office
and Microsoft Exchange; 1998
Conferences & Seminars
Presentation
Given
- Getting
GIS Data from MSDIS, Missouri Mappers Association Conference, Columbia,
MO - November 2001
- MSDIS Mapper - Publishing GIS Data using ArcIMS, Missouri GIS Conference,
Columbia, MO - March 2001
- MSDIS - Navigating the MSDIS Website, Missouri GIS Conference, Columbia,
MO - March 2001
Conferences
Attended
- American Society for Photogrammetry and Remote Sensing Fall Specialty
Conference, Charleston, SC - October 2003
- American Society for Photogrammetry and Remote Sensing Annual
Conference, Anchorage, AK - May 2003
- Missouri GIS Conference, Columbia, MO - March 2003
- American Society
for Photogrammetry and Remote Sensing Fall PECORA Specialty
Conference, Denver, CO - November 2002
- American Society for Photogrammetry and Remote Sensing
Annual Conference, Washington DC - May 2002
- MidAmerica GIS Conference, Kansas City, MO - April
2002
- Missouri
Mappers Association Conference, Columbia, MO
- November 2001
- ESRI 2001 International User Conference, San
Diego,CA - July 2001
- American
Society for Photogrammetry and Remote Sensing Annual
Conference, St. Louis, MO - May 2001
- Missouri GIS Conference, Columbia, MO -
March 2001
- ESRI
2000 International User Conference, San Diego,CA
- June 2000
- American Society for Photogrammetry
and Remote Sensing Annual Conference,
Washington
DC - May 2000
- Mid America GIS Symposium, Lake of
the Ozarks, MO - May 2000.
Publications
Wills,
M. and K.N. Irvine (1996) Application of the National Sanitation Foundation
Water Quality Index in the Cazenovia Creek, NY, Pilot Watershed Management
Project. Middle States Geographer, 29:95-104
|
|